Mass Rapid Transit(MRT)



The Mass Rapid Transit or MRT (
Chinese: 大众快速交通 or more commonly known as 地铁; Malay: Sistem Pengangkutan Gerak Cepat; Tamil: சிங்கை துரிதக் கடவு ரயில்) is a rapid transit system that forms the backbone of the railway system in Singapore, spanning the entire city-state. The initial section of the MRT, between Yio Chu Kang and Toa Payoh, opened in 1987 establishing itself as the second-oldest metro system in Southeast Asia, after Manila's LRT System. The network has since grown rapidly as a result of Singapore's aim of developing a comprehensive rail network as the main backbone of the public transport system in Singapore with an average daily ridership of 1.435 million in FY06/07, though it pales in comparison to the bus network's 2.853 million in the same period.[1]
The MRT has 64 operating stations with 109.4 kilometres of lines and operates on standard gauge. The rail lines have been constructed by the Land Transport Authority, a department of the government of Singapore, which allocates operating concessions to the profit-based corporations SMRT Corporation and SBS Transit. These operators also run bus and taxi services, thus ensuring that there is a full integration of public transport services. The MRT is complemented by the regional Light Rapid Transit (LRT) systems that link MRT stations with HDB public housing estates.[2] Services operate from about 5:30 am and usually end before 1 a.m. daily with frequencies of approximately three to eight minutes, services being extended during festive periods.[3]


History


The origins of the Mass Rapid Transit (MRT) are derived from a forecast by city planners in 1967 which stated the need for a rail-based urban transport system by 1992.
[4][5] Following a debate on whether a bus-only system would be more cost-effective, the Parliament came to the conclusion that an all-bus system would be inadequate, since it would have to compete for road space in a land-scarce country.[6][7] The initial S$5 billion construction of the Mass Rapid Transit network was Singapore's largest public works project at the time, starting on 22 October 1983 at Shan Road.[8] The network was built in stages, with the North South Line given priority because it passed through the Central Area that has a high demand for public transport. The Mass Rapid Transit Corporation (MRTC), later renamed as SMRT Corporation — was established on 14 October 1983; it took over the roles and responsibilities of the former provisional Mass Rapid Transit Authority.[6] On 7 November 1987, the first section of the North South Line started operations, consisting of five stations over six kilometres.[8] Fifteen more stations were opened later, and the MRT system was officially launched on 12 March 1988 by Lee Kuan Yew, then Prime Minister of Singapore. Another 21 stations were subsequently added to the system; the opening of Boon Lay station on the East West Line on 6 July 1990 marked the completion of the system two years ahead of schedule.[9][10]
The MRT has subsequently been expanded. This includes a S$1.2 billion expansion of the North South Line into Woodlands, completing a continuous loop.[11] The concept of having rail lines that bring people almost directly to their homes led to the introduction of the Light Rapid Transit (LRT) lines connecting with the MRT network.[12] On 6 November 1999, the first LRT trains on the Bukit Panjang LRT Line went into operation. To promote tourism, the Changi Airport and Expo stations were added to the MRT network. The North East Line (NEL), the first line operated by SBS Transit, opened on 20 June 2003, one of the first fully automated heavy rail lines in the world. On 15 January 2006, after intense lobbying by the public, Buangkok station was opened.[13][14]